The battery enclosure was excited in vertical and horizontal directions with appropriate values of G-force and time in the form of half sinusoidal waveform as defined in the safety standard.
Key Engineering Solutions
Solutions
TimeTooth adopted a dynamic approach, combining brainstorming for concepts development with a simultaneous virtual analysis of the baseline and conceptualized design’s performance against the safety guidelines of the Electric Vehicle Safety Guide (2019 version), in congruence with the GB/T 1834.3 – Electrical Propelled Road Vehicles Safety Specifications.
With an initial idea to utilize extruded aluminum L-sections for side members, and box sections for middle cross members in the battery enclosure. Following the initial design conceptualization phase, comprehensive design reviews were carried out with the client’s manufacturing facility. This aimed to gauge the feasibility and limitations of extrusion manufacturing while refining the initial concepts. Finite element model was developed with optimum mesh size and element quality criteria as per the industry standards.
Finite Element Analysis of the 4 Wheeler Battery Enclosure was carried out, required as per the safety standards. Modal Analysis was performed to determine the different mode shapes and their respective natural frequencies of the battery enclosure.
Next, GBT Squeeze Test Analysis was performed by squeezing the battery enclosure at the most vulnerable location by a cylindrical impactor of standard dimension with a velocity as defined in the safety standard. Furthermore, Mechanical Shock Test Analysis was performed with the mass of the batteries added to the battery enclosure. The battery enclosure was excited in vertical and horizontal directions with appropriate values of G-force and time in the form of half sinusoidal waveform as defined in the safety standard. Concluding the virtual testing series, Drop Test Analysis was performed by dropping the enclosure vertically downwards from a certain height as mentioned in the safety standard. A comprehensive evaluation of the battery enclosure’s structural performance was completed. The design and analysis were shared with the client.